W.E.B-Production results August 2014

Production results in August are characterized as follows: outstanding electricity generation from hydropower, good results from photovoltaic and results below average from wind energy. In a nutshell W.E.B had a total production of 38,338 MWh in August - production was slightly below target.

 

 

 

 

 

Overview based on technology:


Wind power:

  • Production below target: -10,8%
  • Wind park with best relative results: Barkow: +19,4%
  • Wind power plant with the strongest total production: Deutsch Wagram:
    554 MWh

 

Solar power:

  • Solar power production slightly below target: -1,8%
  • Best relative plant results: Montenero II: +5,8%

 

Hydroelectric power:

  • Hydroelectric power production far above target: +17,2%

 

Production to date:

  • W.E.B production results in July: 38.338 MWh*
  • Accumulated result in the course of the year: 400.398 MWh*
  • Percentage of annual projections: 59,9%*

 

* Participations included in all values.

WEB Windenergie AG   
Davidstraße 1, A-3834 Pfaffenschlag, Telefon: +43 2848 6336, Telefax: +43 2848 6336-14, web@windenergie.at, www.windenergie.at 
         
externer Link zum W.E.B-Shop
E-Mail an WEB Windenergie AG schreiben
interner Link zu den W.E.B-Downloads
externer Link zur W.E.B-facebook Seite